How to read ITD bid results and bid tabs

Last updated

ITD posts results for every highway project it opens on its Contractor Bidding page. The results table has these columns: Bid Opening, Project, Type, Funding, District, Status, Bid Abstracts and Ebid Doc #. Each project links to a short results PDF, and most later get a full bid abstract.

The status column

From ITD’s contractor FAQ:

Results PDF vs. bid abstract

The results PDF (file name br<key>.pdf) lists each bidder, its city and total bid, whether the bid was regular, and, after award, the engineer’s estimate. The bid abstract (abst<key>.pdf) is the full bid tab: a vendor ranking page with each bidder’s total and percent of low bid, then every line item with quantity, unit, and each bidder’s unit price and extended amount. ITD posts the abstract once the contract has been sent, and doesn’t post one for cancelled or rejected projects, FPVQs, or projects with a single bid (ITD FAQ).

Example: FY27 D1 Bridge Repairs (Key 22795)

Bridge preservation in Shoshone and Kootenai counties, opened October 6, 2026, awarded October 22. Results PDF · Bid abstract

BidderTotal bid% of low
Coldwater Group (Pleasant View, UT)$1,992,195.08100%
MJ Hughes (Vancouver, WA)$2,463,679.69123.67%
Granite (Nampa, ID)$2,610,462.35131.03%
N.A. Degerstrom (Spokane Valley, WA)$2,773,349.76139.21%
Combined Construction (Mukilteo, WA)$3,088,937.76155.05%

The engineer’s estimate was $2,633,210.62, so the low bid came in at about 76% of it. The abstract shows a contract time of 75 working days and prices each line, for example item 203-130A, removal of pavement markings, 41,160 feet.

What to do with bid tabs

Irregular bids are handled under ITD Standard Specification Section 102 (ITD FAQ).

FAQ

When does ITD post bid results?

Preliminary results are posted by the end of business on the bid opening day, according to ITD’s contractor FAQ.

What does “Certified” mean on ITD bid results?

It means ITD has finished reviewing the bids for regularity.

Where is the ITD bid tab with unit prices?

In the bid abstract PDF linked in the Bid Abstracts column. ITD posts it once the contract is sent; there is none for cancelled or rejected projects, FPVQs, or single-bid projects.